Home Current routes Archive search Operators

Route 84

Route: Withington Hosp - Southern Cemetry - Cholton - Old Trafford - Piccadilly

Service changes

Date Change details
12/03/1989 Commercial MS ev30mins daytime, E supported ev30mins. Supported Su early hrly, daytime ev30mins by Ribble
12/03/1989 Su GMB service to RIBBLE (Previously Route 49) Commercial MS daytime and E ev30mins
11/06/1989 City Centre route revised
03/09/1989 no apparent change
30/09/1989 RIBBLE to NORTH WESTERN (t/a BEE LINE)
16/10/1989 NORTH WESTERN (t/a BEELINE) to GMB
22/10/1989 Operators revised - all by GMB: 23.10.89 From GMB to NORTH WESTERN T/a BEELINE NORTH WESTERN T/a BEELINE to BEELINE BUZZ COMPANY
02/03/1990 GMB one MF AM jny - GMB (Manchester - Withington Hospital)
02/04/1990 Supported 0633 by CIT. Supported ESu ev30min by GMB
17/06/1990 Timetable revised. More early supported jnys
24/03/1991 Timetable and city route revised: City loop revised. From Albert Square to Piccadilly now via Princess St, MosIey St rather than Cross St & Cannon St. No change from Piccadllly
22/04/1991 M-S Day
27/08/1991 ESu revised: supported ev30mins
10/11/1991 ESu revised
01/05/1992 Early supported CIT jny withdrawn
20/09/1992 timetables revised
28/02/1993 Supported E now by BEE
01/03/1993 M-S Evening GMB to BEELINE BUZZ COMPANY (12161)
08/03/1993 Commercial limited Stop service: IN 0743 0813 to Piccadilly: OUT: 1715 1745 from Stev Sq
27/09/1993 Minor timetable revision
16/10/1993 16.10.93 From NORTH WESTERN to 1111 ????
21/02/1994 Minor timetable revision: Supported Su by GMN, rest by GMS
28/02/1994 Sunday service GM SOUTH to GM NORTH & MS Evening service intoduced By GM NORTH
13/03/1994 GM BUSES (14099) Manchester – Withington Hospital Sunday
08/08/1994 M-S
05/03/1995 timetable revised
01/04/1995 Addtl S morning jnys. Operator revised. Supported early S and Su by BEE (15422) Rest GMS
24/07/1995 Extended to WYTHENSHAWE (Replacing route 110)
24/07/1995 Extended to WYTHENSHAWE (Replacing route 110) . Rerouted in city centre. Timetable revised. M-S daytime ev30mins: supported E ev30mins to With Hosp. NSu by GMB.
24/07/1995 Extended to WYTHENSHAWE (Replacing route 110) . Rerouted in city centre. Timetable revised. M-Su daytime ev30mins: supported ESu ev30mins to With Hosp. Early S by BEE.
13/11/1995 Extended from Wythenshawe/ to AIRPORT. Supported ESu jnys continue tio Withington H
03/12/1995 Minor timetable and city centre route revised
03/03/1996 MS E revised: GMS=SM
25/03/1996 GM SOUTH to STAGECOCH Manchester
20/04/1996 Minor timetable revision: some early S jnys withdrawn
25/05/1996 GM SOUTH to STAGECOCH Manchester
02/09/1996 Minor timetable revision: Su E BEELINE BUZZ COMPANY
21/10/1996 some peak jnys withdrawn
01/12/1996 no change listed
14/06/1998 Route revised. Via Shadow Moss Rd not via Woodhouse Park. Via Mosley St to Piccadilly not by Peter St then Portland St out. BEE=ARR
06/09/1998 Most jnys curtailed at Manchester Airport Bus Station - not serving cargo centre. All jnys via Withington Hospital
25/04/1999 Skyline: Most jnys 15mins later. jnys to Manchester Airport Cargo Centre now via Terminal 2. ARR=AM
21/11/1999 200 reprint
21/11/1999 MS daytime jnys ev30mins diverted in Hulme and Albert Sq - Cross St as 84A. MS E Supported hrly 84A, hrly 84 direct: With Hosp-Picc. As Supported Su ev30mins. Times changed
17/09/2000 Revised to operate WYTHENSHAWE HOSPITAL to Manchester via Wythenshawe & Cholton running M-S daytime ev30mins as 84A. 84: Supported E Picc - Withington Hosp All above by SM. Supported Su 84 ev30mins by ANW Picc-With Hosp.
11/12/2000 Now via Peel Hall and divert to Wythenshawe Hospital - no longer serves Airport. All to/from Piccadilly direct as 84. All 84A jnys run as 84 no longer serve Albert Square & Cross St
29/05/2001 MS 1721 from Mcr retimed 1717.
17/09/2001 replacement: supported Su now hrly - most extended to Wyth Hosp 1010-1810
17/09/2001 Times changed with addtl E jnys extended to Wythenshawe and Hospital
07/01/2002 402 reprint
07/01/2002 M-S jnys rerouted via Princess Parkway (Not Northenden and West Didsbury other than Su jnys) . Times changed .
22/09/2002 times changed
23/02/2003 times changed
29/06/2003 1003 reprint
29/06/2003 SuPH now via Altrincham Rd - Princess Parkway as MS route.
14/06/2004 MF times changed during summer to 4 Sept
Wythenshawe Hospital/West Didsbury - Chorlton - Manchester
05/09/2004 904 reprint
05/09/2004 M-S daytime curtailed at Withington Hosp. Partly replaced by 276. Only to Wythenshawe ESu supported ESu rerouted between Southern Cemetery & Wythenshawe Hospital via Altrincham Rd to Hospital then Benchill - Peel Hall - Wythenshawe - Newall Green loop. So
31/01/2005 M-S E jnys curtailed at Wyth Hospital - no longer serve Wythenshawe and Peel Hall
13/06/2005 MF times changed during summer to 2 Sept
29/01/2006 MS daytime divert via Hardy Lane and Arrowfield Rd In Cholton . Times changed
12/06/2006 Summer service to 1 Sept : M-F peak times changed
03/09/2006 ESu curtailed West Didsbury to Piccadilly. All jnys via Nell La, Arrowfield Rd & Hardy La. Su jnys now SM. PH jnys withdrawn
West Didsbury - Chorlton - Manchester
29/01/2007 1007 reprint
29/01/2007 MF 0753 from ESR now 0749
02/07/2007 MF peak times changed during summer to 31Aug
21/03/2008 PH jnys added to Su times
30/03/2008 109 reprint
30/03/2008 909 reprint
30/03/2008 E jnys curtailed at Arrowfield Rd - Mcr
25/01/2010 Addtl MF 0915 from city
12/04/2010 Supported M-S E hrly now Arriva North West
05/09/2010 MS 1825 from city now 1820
13/03/2011 SuPH times changed:
Reddish - Heaton Chapel - Didsbury - Chorlton - Manchester
01/05/2011 86 Jnys from Arrowfield Rd withdrawn and partly replaced by revised 84
01/05/2011 MS 84 daytime jnys extended to Reddish replacing 42A. Times changed
24/07/2011 MF 0805 from Mcr retimed
04/09/2011 No longer operates via Hardy Lane (Metrolink works)
04/09/2011 Route revised due to Metrolink works: Hardy La no longer served
29/01/2012 Minor changes to MF mornings
02/09/2012 Minor times changed.
07/04/2013 514 reprint
07/04/2013 ESuPH between Southern Cemetery, Cholton and Manchester are retimed. MS E jnys between Cholton and Mcr will be run by MCT
21/07/2013 Times changed during Summer to 31 August 2013
27/04/2014 MCT MS E service no longer operates via Hardy Lane (Metrolink works)
20/07/2014 MF Times changed during Summer to 30 August 2014.
31/08/2014 Normal timetable introduced following the Summer period.
25/01/2015 Rerouted to run via Hardy Lane in Cholton. Minor timetable changes.
12/04/2015 84 MS E jnys Arrowfield Rd - Mcr withdrawn. SuPH jnys slightly retimed. All jnys by SM
26/07/2015 MF times changed during the Summer period from 26 July to 29 August 2015.
30/08/2015 The normal timetable is introduced at the end of the Summer period.
25/01/2016 Times changed.
24/07/2016 Times changed including temporary changes during the Summer period from 24 July to 3 September 2016
04/09/2016 Some MF minor changes to times
30/10/2016 Times changed. Sunday and public holiday jnys will be run by Manchester Community Transport.
29/01/2017 Route withdrawn and replaced by improved bus 42A between Reddish and Withington and to/from Manchester. Bus 85A is also extended to serve Arrowfield Rd and Hardy Lane in Cholton on MS daytimes and bus 169 daytime jnys on Sundays and public holidays are e

Return to route summary page