Route 35
Route: Leigh/Tyldesley - Manchester
Service changes and timetables
| Date | Change details |
|---|---|
| 26/10/1986 | Commercial GMB MS daytime ev30mins, ESuPH hrly |
| 02/02/1987 | no apparent change |
| 25/04/1987 | no apparent change |
| 27/09/1987 | no apparent change |
| 26/10/1987 | no apparent change |
| 03/05/1988 | no apparent change |
| 30/10/1988 | no change listed |
| 04/02/1989 | no change listed |
| 24/07/1989 | Commercial all stops MS daytime ev30mins plus hrly ESu |
| 02/07/1990 | Operators revised: supported MF0525 Boothstown - LH now by ECG |
| 11/11/1991 | Timetable revised |
| 24/11/1991 | no apparent change |
| 30/03/1992 | Timetable revised |
| 10/08/1992 | Addtl jnys |
| 14/09/1992 | no changes listed |
| 05/10/1992 | ECG an jny withdrawn without replacement |
| 25/10/1992 | MF supported 0552 WITHDRAWN. Su 0836 from Ath, 2320 from Mcr WITHDRAWN: |
| 25/01/1993 | no changes listed |
| 15/03/1993 | Day service via Pendleton shopping centre |
| 15/03/1993 | M-S daytime journeys will be rerouted via Pendleton providing a direct service between Swinton and Pendleton, and the timetable will be revised (Please note that there is no change to the evening and Sunday route and timetable). |
| 25/05/1993 | MS E jnys now by NW not GMB |
| 12/06/1993 | no changes listed |
| 16/08/1993 | The following journeys are withdrawn: 0528 Swinton Civic Centre - Manchester (M-F). 0555 Manchester - Leigh (M-F) 2330 Leigh - Boothstown (M-S) In addition some M-F early morning journeys are revised. For full details please see separate timetable leafle |
| 16/08/1993 | no changes listed |
| 15/11/1993 | Supported MS2335 LH-Boothstown by Heatons Travel |
| 13/12/1993 | GMB to GMN |
| 25/04/1994 | Supported MS2335 LH-Boothstown by NW. Sch 0900 by HEA |
| 03/10/1994 | Sch 0844 by JIM |
| 31/10/1994 | 495 reprint |
| 31/10/1994 | no changes listed |
| 30/01/1995 | Some Su jnys via Pendleton |
| 04/06/1995 | 1195 reprint |
| 04/06/1995 | no change listed: GMN M-S daytime ev30mins; ESu hrly. Sch jny by JIM. |
| 05/08/1995 | Late E jnyby NW withdrawn |
| 28/01/1996 | Supported jnys all by GMN |
| 25/03/1996 | GMN to FM t/a GM |
| 01/07/1996 | no changes listed |
| 30/09/1996 | 397 reprint |
| 30/09/1996 | Timetables and city routes changed. Extended to Wigan replacing service 658. MS daytime ev30mins. E hrly WN - LH 39 and LH - Picc 35. Su supported 35 Picc-LH GMB / TIM 39 LH- WN. Sch JIM Stones |
| 30/09/1996 | Timetables and city routes changed. Extended to Wigan replacing service 658. MS daytime ev30mins. Route and terminus in Mcr changed to Piccadilly |
| 03/08/1997 | 298 reprint |
| 03/08/1997 | Curtailed LH - MCR. Replaced by 658. ESu hrly 35 continues. Supported Early and E; commercial daytime. |
| 22/03/1998 | GM to FM |
| 22/06/1998 | Timetable revised |
| 07/09/1998 | 599 reprint |
| 07/09/1998 | no change listed: MS daytime ev30mins, hrly ESu. Su E supported. Sch 0844 by JIM |
| 21/11/1999 | Journeys from Mcr no longer via Deansgate, now via Bridge Street & Salford Central Station. Times unchanged |
| 29/05/2000 | BH jnys added to Su times. NBHE |
| 03/09/2000 | Times changed - divert via Salford Shopping Precinct |
| 07/09/2000 | 0530 from Swinton to city re-instated |
| 29/01/2001 | 0530 WITHDRAWN and replaced by addtl 37 jny |
| 02/11/2001 | no change listed |
| 25/02/2002 | no change listed |
| 29/03/2002 | E jnys added on PH |
| 27/10/2002 | minor time changes: JIM jny withdrawn |
| 29/09/2003 | 0740 from Leigh now 0732 |
| 27/06/2004 | times changed |
| 25/07/2005 | MF times changed during summer to 2 Sept |
| 29/01/2006 | times changed |
| 23/07/2006 | Presume withdrawn on this date and replaced by revised 12 |
| Leigh - Astley - Tyldesley - Roe Green - Swinton - Manchester | |
| 03/04/2016 | New M-S commercial service replacing commercial routes 12 and 25. Some peak jnys extended to/from Mcr via Pendleton. TfGM subsidises daily E route 12 Mcr-Atherton run by Diamond. To assist network simplification and passenger understanding, these supporte |
| 03/04/2016 | 35 X39 Timetable (Replacement) - 16-0320 |
| 24/07/2016 | Times changed including temporary changes during Summer to 3 September 2016 |
| 24/07/2016 to 03/09/2016 | 35 X39 Timetable - 16-0699 |
| Tyldesley - Roe Green - Swinton - Manchester | |
| 04/09/2016 | FM jnys withdrawn |
| 04/09/2016 | FM journeys WITHDRAWN. Leaving supported ESu DIA |
| 04/09/2016 | 35 Timetable - 16-1081 |
| 27/10/2019 | daily hrly E service withdrawn and resource used to sustain an hrly E service 68 between the Trafford Centre and Farnworth via Eccles and Walkden. Roe Green loses its direct link to Swinton and Mcr. This affects average of 0.14 pax/trip M-F, S 0.57 per t |